Connects to end-use equipment via switch boxes, forming a three-tier power distribution system. Residual current devices (RCDs) at both the tertiary (equipment-level) and secondary (zone-level) stages. Ensures safe disconnection in case of faults or leakage currents. In a newly constructed residential area, a 10kV power line is introduced into the substation. After stepping down the voltage through the transformer's low-voltage side (0. 4kV), power distribution is achieved through three levels of distribution boxes: the main distribution board, secondary. The construction power distribution cabinet is designed specifically for the special situation of the construction site and complies with the relevant construction electricity specifications and standards of the construction department. The final rule updates the existing scaffold standards and sets performance-oriented criteria, where possible, to protect. That is, a distribution electric box is arranged under the general distribution box, and a switch box is arranged under the switch box, and electrical equipment is arranged under the switch box to form a three-level distribution.
[PDF Version]